Eurostrutture renewed for three years
30/10/2009 - QUALIFICATION CERTIFICATE production of prefabricated components

Renewal for 3 years for 'QUALIFICATION CERTIFICATE production of prefabricated components in reinforced concrete / pre-stressed reinforced concrete Board of Public Works, Technical service center. Transformer substations for electrical equipment (and tanks) or Model Enel DG 2061ed. 4 (dimensions: 2, s0x4x, 0r.GZ, Glm) or Model Enel DG 2062 (dimensions: 2, xs 03, 30x H? 60m) or Model Enel DG 208L (size: 2,5 x02, L6x H 215m). In the second section you will find documents certifications. All this renewed for another three years.
download Eurostrutture renewed for three years
See also
04/02/2020 - New homologation for Eurostructures
25/09/2015 - Cabins for Wind Power Plant - Eurostrutture
21/11/2013 - ELECTRIC BOX + MEASURES according to CEI 0-16
12/07/2012 - Modular panel substations with foundation tank
20/06/2012 - Eurostrutture opens to the European market
21/10/2011 - Follow us on Facebook
16/09/2011 - The Eolica mediterranean 2011
19/07/2011 - Eolica mediterranean 2011
09/05/2011 - Eurostrutture at the Solar Expo 2011
14/04/2011 - The Eurostrutture at the Solar Expo 2011
16/04/2010 - Eurostrutture gets a new certification
30/10/2009 - Great success at SAIE
30/10/2009 - Eurostrutture renewed for three years
28/09/2009 - Eurostrutture is at Saie
01/04/2009 - Ener Motive: book the invitation
30/07/2008 - New Eurostrutture service
16/05/2008 - Mediel 2008 Eurostrutture presents DG 2061 ED. 5 transformation substation
21/04/2008 - Eurostrutture will be at Mediel
17/03/2008 - New substation DG 2061 ED. 5
19/12/2007 - Birth of the Forum Electrical substations
03/08/2007 - New Portal Site www.cabinelettriche.it